Question 1

Who is responsible for updating the progress of the work completed and remaining during a Sprint?

Product Owner

Scrum Master

Correct answer

Development Team

Stakeholders

Overall explanation

The Development Team is responsible for updating the progress of the work during a Sprint.

Domain

Development Team

Question 2

During a Daily Scrum, a Development Team member realizes that they are working on the wrong task. What should they do?

Continue working on the wrong task and fix it later

Correct answer

Share the issue with the rest of the Development Team and switch to the correct task

Inform the Product Owner about the issue and ask for guidance

Request the Scrum Master to reassign the tasks for all the Development Team members

Overall explanation

The Development Team member should share the issue with the rest of the Development Team and switch to the correct task.

Domain

Daily Scrum

Question 3

The Development Team is experiencing technical difficulties that may impact the Sprint Goal. What should they do?

Escalate the technical difficulties to senior management for resolution

Inform the Product Owner about the technical difficulties and seek their guidance

Continue working and hope that the technical difficulties will be resolved

Correct answer

Collaborate with the Scrum Master to find a solution and minimize the impact

Overall explanation

The Development Team should collaborate with the Scrum Master to find a solution and minimize the impact.

Domain

Development Team

Question 4

True or False: The Sprint Review is an opportunity for the Development Team to inspect the Increment and make changes to the Sprint Backlog.

Correct answer

FALSE

TRUE

Overall explanation

The Sprint Review is an opportunity for the Scrum Team to inspect the Increment, not make changes to the Sprint Backlog.

Domain

Sprint Review

Question 5

What is the recommended time-box for the Sprint Planning event for a two-weeks Sprint.

Correct answer

4 hours

1 hour

2 hours

8 hours

Overall explanation

The recommended time-box for the Sprint Planning event for a two-weeks Sprint is 4 hours.

Domain

Sprint Planning

Question 6

During a Sprint, the Development Team identifies a risk that may impact the Sprint Goal. What should they do?

Escalate the risk to senior management for resolution

Correct answer

Collaborate with the Product Owner to assess the risk and take necessary actions

Inform the Scrum Master about the risk and let them handle it

Ignore the risk and hope that it doesn’t impact the Sprint Goal

Overall explanation

The Development Team should collaborate with the Product Owner to assess the risk and take necessary actions.

Domain

Development Team

Question 7

True or False: The Product Owner is responsible for prioritizing the Product Backlog and deciding the order of User Stories to be worked on.

Correct answer

TRUE

FALSE

Overall explanation

The Product Owner is responsible for prioritizing the Product Backlog and deciding the order of User Stories to be worked on.

Domain

Product Owner

Question 8

The Scrum Master is not allowed to act as a Developer.

Correct answer

FALSE

TRUE

Overall explanation

The Scrum Master can act as a Developer. Scrum doesn’t prohibits it but also, doesn’t encourage or recommend it either.

Domain

Scrum Master

Question 9

Select the correct Scrum Pillars.

Dedication

Correct selection

Transparency

Focus

Correct selection

Inspection

Overall explanation

The three pillars of Scrum are Transparency, Inspection, and Adaptation.

Domain

Scrum Pillars

Question 10

True or False: The Product Owner is responsible for creating and maintaining the Sprint Backlog.

Correct answer

FALSE

TRUE

Overall explanation

The Product Owner is responsible for creating and maintaining the Product Backlog, not the Sprint Backlog.

Domain

Product Backlog

Question 11

True or False: The Sprint Retrospective is an opportunity to inspect and adapt the Scrum Team’s interactions and practices.

FALSE

Correct answer

TRUE

Overall explanation

The Sprint Retrospective is an opportunity to inspect and adapt the Scrum Team’s interactions and practices.

Domain

Sprint Retrospective

Question 12

What is the recommended size for a Scrum Development Team when the team is working remotely.

2 – 8 members

5-7 members

10-15 members

Correct answer

3-9 members

Overall explanation

The recommended size for a Scrum Development Team is 3-9 members.

Domain

Scrum Development Team

Question 13

In Scrum, what is the primary responsibility of the Development Team?

To manage the project

Correct answer

To deliver a potentially releasable Increment

To prioritize the Product Backlog

To define the product features

Overall explanation

The primary responsibility of the Development Team is to deliver a potentially releasable Increment at the end of each Sprint.

Domain

Development Team

Question 14

The Development Team has concerns about the quality of the Increment due to time constraints. What should they do?

Correct answer

Collaborate with the Product Owner to reprioritize and adjust the Sprint Backlog

Sacrifice additional features to ensure the quality of the Increment

Request additional time from the stakeholders to improve the quality of the Increment

Ignore the quality concerns and deliver the Increment on time

Overall explanation

The Development Team should collaborate with the Product Owner to reprioritize and adjust the Sprint Backlog.

Domain

Development Team

Question 15

True or False: The Scrum Master is responsible for making all the decisions related to the Sprint and the Development Team.

TRUE

Correct answer

FALSE

Overall explanation

The Scrum Master is not responsible for making all the decisions. It is a collaborative effort within the Scrum Team.

Domain

Scrum Master

Question 16

What is the purpose of the Daily Scrum?

To provide a status update

Correct answer

To synchronize activities

To discuss and resolve issues

To review and approve user stories

Overall explanation

The Daily Scrum helps synchronize activities and create a plan for the next 24 hours.

Domain

Daily Scrum

Question 17

What is the maximum duration for a Sprint for a business new to Scrum.

2 weeks

1 week

Correct answer

4 weeks

6 weeks

Overall explanation

The maximum duration for a Sprint is 4 weeks regardless of if a business is new to Scrum or not.

Domain

Sprint

Question 18

The Product Owner wants to remove an item from the Product Backlog permanently. What should they do?

Correct answer

Collaborate with the stakeholders and assess the impact of removing the item from the Product Backlog

Reject the Product Owner’s request and keep the item in the Product Backlog

Remove the item from the Product Backlog without any discussion

Request the Scrum Master to make the decision on whether to remove the item from the Product Backlog

Overall explanation

The Product Owner should collaborate with the stakeholders and assess the impact of removing the item from the Product Backlog.

Domain

Product Owner

Question 19

True or False: The Scrum Master is responsible for ensuring that the Development Team meets the Sprint Goal.

TRUE

Correct answer

FALSE

Overall explanation

The Scrum Master is not responsible for ensuring that the Development Team meets the Sprint Goal. It is a collective responsibility.

Domain

Scrum Master

Question 20

During a Sprint, the Product Owner identifies a critical defect in the Increment that requires immediate attention. What should they do?

Request the Scrum Master to address the defect immediately

Correct answer

Collaborate with the Development Team to determine the impact on the Sprint Goal and prioritize accordingly

Ignore the defect and continue with the planned User Stories

Notify the stakeholders about the defect and seek their guidance

Overall explanation

The Product Owner should collaborate with the Development Team to determine the impact on the Sprint Goal and prioritize accordingly.

Domain

Product Owner

Question 21

The Scrum Master realizes that the Development Team is not adhering to the agreed Scrum practices. What should they do?

Correct answer

Facilitate a retrospective to identify the reasons for non-adherence and discuss potential improvements

Request the Product Owner to enforce the adherence to Scrum practices

Ignore the issue and hope that the Development Team will self correct

Punish the Development Team for not following the Scrum practices

Overall explanation

The Scrum Master should facilitate a retrospective to identify the reasons for non-adherence and discuss potential improvements.

Domain

Scrum Master

Question 22

Which event serves as an opportunity for Stakeholders to inspect the Increment and provide feedback?

Daily Scrum

Sprint Retrospective

Sprint Planning

Correct answer

Sprint Review

Overall explanation

The Sprint Review is where the stakeholders inspects the Increment and provides feedback.

Domain

Sprint Review

Question 23

During a Sprint, the Development Team realizes that the selected User Stories are not feasible within the given time frame. What should they do?

Continue working on the selected User Stories and extend the Sprint duration

Request additional team members to complete the selected User Stories

Correct answer

Collaborate with the Product Owner to reprioritize and adjust the Sprint Backlog

Drop the selected User Stories and focus on the remaining ones

Overall explanation

The Development Team should collaborate with the Product Owner to reprioritize and adjust the Sprint Backlog.

Domain

Development Team

Question 24

Which event is used to review and adjust the Sprint Backlog?

Sprint Retrospective

Correct answer

Sprint Planning

Daily Scrum

Sprint Review

Overall explanation

The Sprint Planning event is used to review and adjust the Sprint Backlog for the upcoming Sprint.

Domain

Sprint Planning

Question 25

The Product Owner wants to change the Sprint Goal in the middle of the Sprint due to new market opportunities. What should the Development Team do?

Immediately change the Sprint Goal without any discussion

Request the Scrum Master to make the decision on whether to change the Sprint Goal

Reject the Product Owner’s request and continue working on the original Sprint Goal

Correct answer

Collaborate with the Development Team to assess the impact on the selected User Stories and the Sprint Goal

Overall explanation

The Product Owner should collaborate with the Development Team to assess the impact on the selected User Stories and the Sprint Goal.

Domain

Development Team

Question 26

True or False: The Sprint Retrospective is a formal meeting where the Development Team presents their work to the stakeholders.

TRUE

Correct answer

FALSE

Overall explanation

The Sprint Retrospective is a meeting within the Scrum Team to inspect and adapt their working processes, not a formal presentation to stakeholders.

Domain

Sprint Retrospective

Question 27

The Development Team wants to change the Sprint duration for future Sprints to have more time for development. What should they do?

Correct answer

Discuss this is in the Sprint Retrospective event.

Reject the idea of changing the Sprint duration and continue with the current duration

Request approval from senior management before changing the Sprint duration

Extend the Sprint duration without involving the Product Owner and the Scrum Master

Overall explanation

The Development Team should collaborate with the Product Owner and the Scrum Master to assess and discuss it in detail at the Sprint Retrospective.

Domain

Development Team

Question 28

True or False: The Scrum Master is responsible for removing any impediments that the Development Team encounters during the Sprint.

FALSE

Correct answer

TRUE

Overall explanation

The Scrum Master is responsible for removing any impediments that the Development Team encounters during the Sprint.

Domain

Scrum Master

Question 29

What is the recommended maximum size for a Development Team?

Correct answer

9 members

7 members

5 members

There is no recommended maximum size

Overall explanation

The recommended maximum size for a Development Team is 9 members to promote effective collaboration and communication.

Domain

Development Team

Question 30

The Scrum Master identifies a conflict between two Development Team members during the Sprint. What should they do?

Remove one of the members from the Development Team

Request the Product Owner to mediate and resolve the conflict

Correct answer

Facilitate a conversation between the two members to address the conflict and find a resolution

Ignore the conflict and let the Development Team members resolve it on their own

Overall explanation

The Scrum Master should facilitate a conversation between the two

Question 31

True or False: The Sprint Review is an opportunity for the Product Owner to present the Increment to the stakeholders.

FALSE

Correct answer

TRUE

Overall explanation

The Sprint Review is an opportunity for the Scrum Team to present the Increment to the stakeholders.

Domain

Sprint Review

Question 32

True or False: The Scrum Master is responsible for updating the Burndown Chart and tracking the progress of the Sprint.

Correct answer

FALSE

TRUE

Overall explanation

The Development Team is responsible for updating the Burndown Chart and tracking the progress of the Sprint.

Domain

Scrum Master

Question 33

True or False: The Sprint Review is an opportunity for the stakeholders to provide feedback on the Increment and make changes to the Product Backlog.

Correct answer

FALSE

TRUE

Overall explanation

The Sprint Review is an opportunity for the stakeholders to provide feedback on the Increment, not make changes to the Product Backlog.

Domain

Sprint Review

Question 34

True or False: The Product Owner is responsible for managing the team’s progress during the Sprint and ensuring that the tasks are completed on time.

TRUE

Correct answer

FALSE

Overall explanation

The Development Team is responsible for managing the team’s progress during the Sprint and ensuring that the tasks are completed on time.

Domain

Product Owner

Question 35

What is the purpose of the Daily Scrum?

Correct answer

To synchronize activities

To discuss and resolve issues

To provide a status update

To review and approve user stories

Overall explanation

The Daily Scrum helps synchronize activities and create a plan for the next 24 hours.

Domain

Daily Scrum

Question 36

True or False: The Scrum Master is responsible for creating and maintaining the Product Backlog.

TRUE

Correct answer

FALSE

Overall explanation

The Product Owner is responsible for creating and maintaining the Product Backlog, not the Scrum Master.

Domain

Product Backlog

Question 37

What is the recommended maximum length for a Sprint?

Correct answer

4 weeks

It can vary depending on the nature of the project

2 weeks

1 week

Overall explanation

The recommended maximum length for a Sprint is 4 weeks to maintain a sustainable pace and enable frequent inspection and adaptation.

Domain

Sprint

Question 38

What is the recommended size for a Scrum Development Team comprising 3 highly experienced developers.

10-15 members

Correct answer

3-9 members

5-7 members

3-10 members

Overall explanation

The recommended size for a Scrum Development Team is 3-9 members.

Domain

Scrum Development Team

Question 39

Which event is used to inspect the Increment and adapt the Product Backlog if needed?

Daily Scrum

Sprint Planning

Correct answer

Sprint Review

Sprint Retrospective

Overall explanation

The Sprint Review is where the Increment is inspected, and the Product Backlog may be adapted.

Domain

Sprint Review

Question 40

What is the recommended frequency for updating the Sprint Backlog during a Sprint?

It can vary depending on the team’s needs

Weekly

Correct answer

Daily

Every other day

Overall explanation

The Sprint Backlog should be updated daily to reflect the progress and any changes during the Sprint.

Domain

Sprint Backlog

Question 41

What is the purpose of the Sprint Burndown Chart?

Correct answer

To track the progress of work

To visualize the Product Backlog

To calculate team velocity

To estimate effort for user stories

Overall explanation

The Sprint Burndown Chart helps track the progress of work and shows the remaining work throughout the Sprint.

Domain

Sprint Burndown Chart

Question 42

The Development Team is facing challenges in understanding the requirements for a User Story. What should they do?

Request the Scrum Master to communicate the requirements clearly

Make assumptions and proceed with the development

Correct answer

Collaborate with the Product Owner to clarify the requirements

Ignore the challenges and continue working based on their interpretation

Overall explanation

The Development Team should collaborate with the Product Owner to clarify the requirements.

Domain

Development Team

Question 43

Who has the authority to cancel a Sprint?

Stakeholders

Scrum Master

Correct answer

Product Owner

Development Team

Overall explanation

The Product Owner has the authority to cancel a Sprint if the Sprint Goal becomes obsolete.

Domain

Product Owner

Question 44

True or False: The Product Owner is responsible for facilitating the Daily Scrum meeting and ensuring that the Development Team members attend.

Correct answer

FALSE

TRUE

Overall explanation

The Product Owner is not responsible for facilitating the Daily Scrum meeting. It is the responsibility of the Development Team.

Domain

Product Owner

Question 45

True or False: The Sprint Retrospective is a mandatory event in Scrum and must be conducted at the end of each Sprint.

Correct answer

TRUE

FALSE

Overall explanation

The Sprint Retrospective is a mandatory event in Scrum and must be conducted at the end of each Sprint.

Domain

Sprint Retrospective

Question 46

Who is responsible for the Product Backlog in Scrum when the Product Owner is also a Developer.

Scrum Master

Development Team

Stakeholders

Correct answer

Product Owner

Overall explanation

The Product Owner is responsible for the Product Backlog.

Domain

Product Backlog

Question 47

The Product Owner wants to add more User Stories to the Sprint Backlog during the Sprint. What should the Scrum Master do?

Reject the Product Owner’s request to add more User Stories

Make the decision to add more User Stories on behalf of the Development Team

Allow the Product Owner to add the User Stories without any discussion

Correct answer

Facilitate a discussion with the Product Owner and the Development Team to assess the impact on the Sprint Goal

Overall explanation

The Scrum Master should facilitate a discussion with the Product Owner and the Development Team to assess the impact on the Sprint Goal.

Domain

Scrum Master

Question 48

Which event serves as an opportunity for the Product Owner to inspect the Increment and provide feedback?

Sprint Planning

Sprint Retrospective

Correct answer

Sprint Review

Daily Scrum

Overall explanation

The Sprint Review is where the Product Owner inspects the Increment and provides feedback.

Domain

Sprint Review

Question 49

The Development Team wants to change their Definition of Done to include additional criteria. What should they do?

Request external consultants to decide on the changes to the Definition of Done

Reject the idea of changing the Definition of Done and continue with the current criteria

Correct answer

Collaborate with the Product Owner and the Scrum Master to assess the impact of the changes

Implement the changes to the Definition of Done without involving the Product Owner and the Scrum Master

Overall explanation

The Development Team should collaborate with the Product Owner and the Scrum Master to assess the impact of the changes.

Domain

Development Team

Question 50

True or False: The Scrum Master is responsible for removing impediments that are blocking the progress of the Development Team.

FALSE

Correct answer

TRUE

Overall explanation

The Scrum Master has the responsibility to identify and remove impediments to help the Development Team progress.

Domain

Scrum Master

Question 51

In Scrum, who is responsible for the order of items in the Product Backlog?

Stakeholders

Correct answer

Product Owner

Scrum Master

Development Team

Overall explanation

The Product Owner is responsible for prioritizing and ordering the items in the Product Backlog.

Domain

Product Backlog

Question 52

True or False: The Sprint Retrospective is an opportunity to inspect the Increment and adapt the Product Backlog accordingly.

TRUE

Correct answer

FALSE

Overall explanation

The Sprint Retrospective is an opportunity to inspect the Sprint and adapt the working processes, not the Product Backlog.

Domain

Sprint Retrospective

Question 53

The Scrum Master and Product Owner roles can also be Developers within the Scrum Team.

Correct answer

FALSE

TRUE

Overall explanation

Yes the Product Owner and Scrum Master roles can be Developers. Not prohibited by Scrum but not recommended either.

Domain

Scrum Roles

Question 54

During a Sprint, the Product Owner identifies a valuable User Story that was not planned for the current Sprint. What should they do?

Request the Scrum Master to make the decision on whether to add the User Story

Add the User Story to the current Sprint without considering the impact

Reject the User Story and continue with the planned User Stories

Correct answer

Add the User Story to the Product Backlog and consider it for future Sprints

Overall explanation

The Product Owner should add the User Story to the Product Backlog and consider it for future Sprints.

Domain

Product Owner

Question 55

Who is responsible for ensuring transparency in the Scrum Team’s progress toward the Sprint Goal?

Development Team

Correct answer

Scrum Master

Product Owner

Stakeholders

Overall explanation

The Scrum Master is responsible for ensuring transparency in the Scrum Team’s progress toward the Sprint Goal.

Domain

Scrum Master

Question 56

True or False: The Scrum Master is a management position within the organization.

Correct answer

FALSE

TRUE

Overall explanation

The Scrum Master is not a management position, but a facilitative role within the organization for promotion of Scrum and provide coaching to the team that the role serves.

Domain

Scrum Master

Question 57

A Product Owner can also be a Developer.

FALSE

Correct answer

TRUE

Overall explanation

Yes the Product Owner can be a Developer. Not prohibited by Scrum but not recommended either.

Domain

Product Owner

Question 58

In Scrum, who is responsible for ensuring the Development Team understands the Product Goal and the upcoming work in the Product Backlog?

Correct answer

Product Owner

Stakeholders

Development Team

Scrum Master

Overall explanation

The Product Owner is responsible for ensuring the Development Team understands the Product Goal and the upcoming work.

Domain

Product Owner

Question 59

During a Daily Scrum, a Development Team member realizes that they won’t be able to complete their assigned task. What should they do?

Inform the Product Owner about the issue and ask for a different task

Hide the issue and hope that someone else will complete the task

Request the Scrum Master to reassign the task to another Development Team member

Correct answer

Share the issue with the rest of the Development Team and discuss possible solutions

Overall explanation

The Development Team member should share the issue with the rest of the Development Team and discuss possible solutions.

Domain

Daily Scrum

Question 60

What is the recommended frequency for conducting Sprint Retrospectives?

Correct answer

Every Sprint

Once per month

Once per quarter

Every other Sprint

Overall explanation

Sprint Retrospectives should be conducted at the end of every Sprint.

Domain

Sprint Retrospective

Question 61

True or False: The Product Owner is a member of the Development Team.

TRUE

Correct answer

FALSE

Overall explanation

The Product Owner is not a member of the Development Team but works closely with them to prioritize and clarify requirements.

Domain

Product Owner

Question 62

True or False: The Product Owner can change the Sprint Goal during the Sprint.

Correct answer

FALSE

TRUE

Overall explanation

Once the Sprint has started, the Sprint Goal should remain unchanged to provide a clear focus for the Development Team.

Domain

Sprint Goal

Question 63

What is the role of the Scrum Master in the Daily Scrum?

Correct answer

To facilitate the meeting

To provide status updates

To make decisions for the team

To assign tasks to the team

Overall explanation

The Scrum Master’s role in the Daily Scrum is to facilitate the meeting and ensure it stays focused.

Domain

Scrum Master

Question 64

Which artifact captures the commitment of the Development Team for the upcoming Sprint?

Product Backlog

Product Increment

Burndown Chart

Correct answer

Sprint Backlog

Overall explanation

The Sprint Backlog captures the commitment of the Development Team for the upcoming Sprint.

Domain

Sprint Backlog

Question 65

True or False: The Scrum Master ensures that the Development Team has a clear understanding of the selected Product Backlog items.

TRUE

Correct answer

FALSE

Overall explanation

The Scrum Master is not responsible for ensuring the Development Team’s understanding of selected Product Backlog items.

Domain

Scrum Master

Question 66

Who is responsible for managing the progress of work during a Sprint?

Product Owner

Scrum Master

Project Manager

Correct answer

Development Team

Overall explanation

The Development Team is responsible for managing the progress of work during a Sprint.

Domain

Development Team

Question 67

During a Sprint, the Development Team realizes that they need to acquire new skills to complete the User Stories. What should they do?

Continue working on the User Stories and hope that they can learn the required skills as they progress

Request external training for the required skills

Reject the User Stories that require new skills and focus on the ones they are familiar with

Correct answer

Collaborate with the Product Owner to adjust the Sprint Backlog and acquire the necessary skills

Overall explanation

The Development Team should collaborate with the Product Owner to adjust the Sprint Backlog and acquire the necessary skills.

Domain

Development Team

Question 68

True or False: The Product Owner role can be shared among multiple individuals.

Correct answer

FALSE

TRUE

Overall explanation

The Product Owner role should ideally be fulfilled by one person to ensure accountability and clear decision-making.

Domain

Product Owner

Question 69

The Development Team wants to change the Sprint Backlog during the Sprint to reflect new insights. What should they do?

Ask the Scrum Master to decide whether to change the Sprint Backlog

Reject the idea of changing the Sprint Backlog and continue with the original plan

Correct answer

Collaborate with the Product Owner to adjust the Sprint Backlog based on the new insights

Continue working on the existing Sprint Backlog without any changes

Overall explanation

The Development Team should collaborate with the Product Owner to adjust the Sprint Backlog based on the new insights.

Domain

Development Team

Question 70

True or False: The Development Team is responsible for determining how much work can be completed in a Sprint.

Correct answer

TRUE

FALSE

Overall explanation

The Development Team is responsible for determining how much work they can commit to delivering in a Sprint.

Domain

Development Team

Question 71

True or False: The Scrum Master is a management position within the Scrum Team

TRUE

Correct answer

FALSE

Overall explanation

The Scrum Master is not a management position, but a facilitative role within the Scrum Team.

Domain

Scrum Master

Question 72

What is the purpose of the Sprint Goal?

To estimate effort for user stories

To outline the tasks for the Sprint

To define the length of the Sprint

Correct answer

To provide a high-level vision

Overall explanation

The Sprint Goal provides a high-level vision for the Sprint, guiding the Development Team’s work.

Domain

Sprint Goal

Question 73

What is the maximum time-box for the Sprint Review?

2 hours

Correct answer

4 hours

30 minutes

1 hour

Overall explanation

The maximum time-box for the Sprint Review is 4 hours.

Domain

Sprint Review

Question 74

The Product Owner wants to remove a User Story from the Sprint Backlog during the Sprint. What should the Development Team do?

Refuse the Product Owner’s request and continue working on the User Story

Remove the User Story without considering the impact on the Sprint Goal

Correct answer

Collaborate with the Product Owner to assess the impact of removing the User Story on the Sprint Goal

Request approval from senior management before removing the User Story

Overall explanation

The Development Team should collaborate with the Product Owner to assess the impact of removing the User Story on the Sprint Goal.

Domain

Development Team

Question 75

Who is responsible for managing the progress of work during a Sprint?

Scrum Master

Product Owner

Project Manager

Correct answer

Development Team

Overall explanation

The Development Team is responsible for managing the progress of work during a Sprint.

Domain

Development Team

Question 76

The Development Team estimates the User Stories during Sprint Planning but realizes later that the estimates were inaccurate. What should they do?

Continue working on the User Stories without considering the accuracy of the estimates

Correct answer

Reflect on the reasons for inaccurate estimates and improve their estimation process

Request additional time to complete the User Stories due to inaccurate estimates

Ask the organization for more resources to complete the work

Overall explanation

The Development Team should reflect on the reasons for inaccurate estimates and improve their estimation process.

Domain

Development Team

Question 77

The Development Team cant depend on external resources for their work.

FALSE

Correct answer

TRUE

Overall explanation

This is correct as this is against the spirit of a cross-functional team.

Domain

Development Team

Question 78

The Scrum Team is required to release an increment at the Sprint.

Correct answer

FALSE

TRUE

Overall explanation

The is not correct. Releasing the increment is not mandatory.

Domain

Sprint

Question 79

Who is responsible for the Product Backlog in Scrum?

Scrum Master

Correct answer

Product Owner

Stakeholders

Development Team

Overall explanation

The Product Owner is responsible for the Product Backlog.

Domain

Product Backlog

Question 80

True or False: The Scrum Master is responsible for ensuring that the Daily Scrum meeting is conducted and that the Development Team members attend.

Correct answer

TRUE

FALSE

Overall explanation

The Scrum Master is responsible for ensuring that the Daily Scrum meeting is conducted and that the Development Team members attend.

Domain

Scrum Master